Civil Construction & Maintenance
Civil construction and infrastructure works across industrial, commercial and residential sites in the UAE, delivered by experienced engineers and skilled manpower under disciplined project management. See completed packages below, including Baynunah Palace and Al Maqam Palace.
Overview
Our civil works specialise in delivering durable, code-compliant construction across the UAE. From foundations and structural concrete to interlock paving, manholes, drainage, masonry and earthworks, every project is executed with precision, safety, and compliance with industry standards.
Looking for waterproofing or epoxy flooring? Those are covered in detail under Waterproofing & Epoxy Coatings, including our 10–20 year waterproofing warranties and Sika-certified epoxy with a 5-year warranty.
Civil & Infrastructure Capabilities
Verified compaction. Backfill and compaction works are supported by third-party compaction test reports, independent verification that buried works meet specification before they’re closed up.
Civil & Maintenance
- Industrial, commercial & residential
- Interlock, curbstone & hardscape
- Manholes, sleeve pipe & drainage
- Third-party compaction testing
- Building & structural maintenance
- Skilled manpower & engineers

Infrastructure, Delivered
Interlock & Curbstone, Majlis
Several thousand m² of interlock paving including curbstone for a majlis in Baynunah.
Manholes & Sleeve Pipework
Large manholes, sleeve pipework and connections at Baynunah and Musaffah Palaces for a leading private client, excavation and backfill verified by third-party compaction reports.
Boundary Wall & Finishing
Boundary-wall painting at the palace, with external light fixing and electrical works.
AHU Roof & Wheel Stoppers
AHU roof rectification, permanent concrete ceiling repair and 934 customised RCC wheel stoppers.
Access-Control Foundations
Reinforced M30 foundations for turnstile installation, with interlock reinstatement to the approach, cast under permit in night-shift windows.
Butterfly Garden Walkway
Main walkway ramp, WPC walkway decking and the equipment and mechanical rooms for the Butterfly Garden.
Interlock Paving & External Works
≈650 m² interlock paving, 4 m pathway road, precast kerbstones and 27 garden lights, in 30 days.
RCC Wheel Stopper Programme
1,328 precast RCC wheel stoppers across Marsa Al Bateen, Yas Mall and Saadiyat, night works under CID permits.