Projects & Group Experience

Selected Costro projects across all seven service lines, alongside offshore references delivered by our management team through affiliated group companies.

Projects in Detail

A closer look at selected projects and the multiple scopes Costro delivered on each.

Civil Construction & Maintenance

Completed interlock paving works at Baynunah Palace

Baynunah Palace, Boundary Wall & External Development

New boundary wall and external development: interlock paving, RCC utility manholes, sleeve routes, boundary/solar lighting, new electrical room

LocationAbu Dhabi
Client typePrivate palace estate
Key quantity1,200 m² interlock paving; 43 RCC manholes
Programme4-month coordinated programme
43 manholes carry a 5-year cover warranty
Finished customised wheel stoppers at Yas Mall

Yas Mall, Rectification & Protection Works

AHU roof rust rectification and waterproofing, permanent structural concrete ceiling repair at Gates 3 & 4, replacement of customised RCC wheel stoppers

LocationYas Island, Abu Dhabi
Client typeFacilities management (mall)
Key quantity934 customised RCC wheel stoppers; 50 AHU roof locations rectified
Permanent repair system specified for the ceiling package, not a temporary patch
Installed RCC car wheel stoppers

RCC Wheel Stopper Programme

Repeat-order supply, installation, alignment and finishing of precast RCC car wheel stoppers across three sites

LocationMarsa Al Bateen, Yas Mall, Saadiyat (3 Abu Dhabi sites)
Client typeFacilities management
Key quantity1,328 precast RCC units total (331 Marsa Al Bateen, 934 Yas Mall, 63 Saadiyat)
ProgrammeNight works under CID permits; Marsa Al Bateen 45 working days, Saadiyat 15-day programme
Each site completed within its programme and handed back without interrupting daytime operations
Completed interlock paving and garden lights at Al Maqam Palace

Al Maqam Palace, Interlock Paving & Kerbstone Works

Interlock paving and external works, 4 m pathway road, precast concrete kerbstones, paving to garage area, new garden lights

LocationAl Ain, Abu Dhabi
Client typePrivate palace estate
Key quantity≈650 m² interlock paving; 27 garden lights
Programme30-day programme
Reinforced foundation cast to M30 with conduit set in before pouring

Access-Control Foundations & Paving Reinstatement

Reinforced concrete foundations for turnstile installation, cast to M30 with conduit routed for access-control cabling, plus interlock reinstatement to the approach

LocationAbu Dhabi Ship Building
Client typeIndustrial & Facilities
Key quantityM30 concrete grade; 150 mm bar centres
ProgrammePermit-controlled night works, programmed around the facility's operating hours
7-day controlled cure before load; 1-year workmanship warranty from handover
Final coat application, combo waterproofing at Musaffah Palace

Musaffah Palace, MEP, Infrastructure & Waterproofing

Combined MEP and civil infrastructure, followed by a combo-system waterproofing package to the majlis roof

LocationMusaffah, Abu Dhabi
Client typePrivate palace estate
Key quantity400 m² majlis roof waterproofing
ProgrammeSeveral disciplines coordinated under one accountable scope
10-year waterproofing warranty on the roofing package
Completed epoxy floor coating at Al Mada

Al Mada, Parking Rehabilitation & Epoxy Flooring

Parking-area rehabilitation and floor-coating package: concrete repair, Sika epoxy flooring system, reflective traffic marking

LocationAl Mada, Al Ain
Client typeIFM Facilities Management LLC
Key quantity3,100 m² parking area
Programme45-day programme, phased for partial facility access

Butterfly Garden, Walkway Works

Main walkway ramp and handrails, WPC walkway decking, equipment and mechanical rooms

LocationAl Qana, Abu Dhabi
Client typeButterfly Garden (attraction)

Structural & Architectural Steel

Waterproofing & Epoxy

Finished customised wheel stoppers at Yas Mall

Yas Mall, Rectification & Protection Works

AHU roof rust rectification and waterproofing, permanent structural concrete ceiling repair at Gates 3 & 4, replacement of customised RCC wheel stoppers

LocationYas Island, Abu Dhabi
Client typeFacilities management (mall)
Key quantity934 customised RCC wheel stoppers; 50 AHU roof locations rectified
Permanent repair system specified for the ceiling package, not a temporary patch
Final coat application, combo waterproofing at Musaffah Palace

Musaffah Palace, MEP, Infrastructure & Waterproofing

Combined MEP and civil infrastructure, followed by a combo-system waterproofing package to the majlis roof

LocationMusaffah, Abu Dhabi
Client typePrivate palace estate
Key quantity400 m² majlis roof waterproofing
ProgrammeSeveral disciplines coordinated under one accountable scope
10-year waterproofing warranty on the roofing package
Torch-applied mineral membrane at Al Andalus Villa Compound

Al Andalus Villa Compound, Waterproofing Renewal

Removal and reinstallation of torch-applied waterproofing membrane system across six villas

LocationAl Ain, Abu Dhabi
Client typeIFM Facilities Management LLC
Key quantity6 villas
Programme1-week fast-track programme
48-hour ponding test passed, 10-year waterproofing warranty
Final epoxy top coat at the Al Zeina pool ramp

Al Zeina, Pool Ramp Epoxy Flooring

Slip-resistant Sika epoxy flooring system applied to the swimming-pool ramp

LocationAl Zeina, Abu Dhabi
Client typeFacilities management
Key quantity257.1 m²
Programme30 days
Sika Certified Applicator using genuine Sika materials; 5-year workmanship warranty
Completed epoxy floor coating at Al Mada

Al Mada, Parking Rehabilitation & Epoxy Flooring

Parking-area rehabilitation and floor-coating package: concrete repair, Sika epoxy flooring system, reflective traffic marking

LocationAl Mada, Al Ain
Client typeIFM Facilities Management LLC
Key quantity3,100 m² parking area
Programme45-day programme, phased for partial facility access

MEP Services

Offshore & Transport Steelwork

Interior Fit-Out

Stainless Steel & Kitchen Equipment

Offshore Group References

Reference note: The projects below were executed through affiliated group companies and associated businesses, and represent the collective experience of our management team. They are presented as group references demonstrating the capability and standards Costro brings to offshore fabrication scopes.

Transport beams fabricated for a major offshore gas development
a group logistics partner, Group Reference

Major Offshore Gas Development, Transport Steel

120+
Tonnes, Transport Beams
Scope of Work
  • Fabrication of heavy transport beams
  • Heavy transport steel packages
  • Delivery to project specifications
Challenge

Supporting one of the UAE’s largest offshore developments with heavy transport steel delivered against a fixed project schedule.

Outcome

More than 120 tonnes of transport beams fabricated and delivered according to schedule and specification.

Sea-fastening bracings fabricated for a major offshore gas development
a group logistics partner, Group Reference

Major Offshore Gas Development, Sea-Fastening

100+
Tonnes, Sea-Fastening Steel
Scope of Work
  • Large transport bracings
  • Bracing & heavy-duty padeyes
  • Cleats & dog plates
  • Barge manholes & mooring padeyes
  • Miscellaneous sea-fastening steel
Execution

Modules were fabricated at a UAE marine engineering facility. Offshore transportation was carried out by a group logistics partner using the fabricated sea-fastening steel.

Outcome

More than 100 tonnes of sea-fastening steel delivered on time with zero recorded delays.