Al Mada, Parking Rehabilitation & Epoxy Flooring
A complete parking-area rehabilitation and floor-coating package delivered for IFM Facilities Management at Al Mada, Al Ain, concrete repair, a high-performance Sika epoxy flooring system and full reflective traffic marking, completed in 45 days.
Project Facts
Repair, Coat & Mark Out
Cracked and damaged concrete flooring was repaired using Sika repair chemicals and epoxy filler, followed by surface preparation, one coat of Sika floor sealer (primer), an anti-slip coating and two coats of Sika epoxy floor paint, a durable, abrasion-resistant finish suitable for trafficked parking areas.
The package included reflective traffic marking works, parking bay lines, directional arrows, numbering and guidance markings, with kerbstones repainted to specification and parking-area walls finished in two coats of Sika Fenomastic paint. The site was handed over after comprehensive cleaning, with all construction waste disposed of in accordance with Abu Dhabi Municipality (ADM) regulations.







Project Detail
Scope of Work
- Parking area rehabilitation
- Epoxy flooring installation across 3,100 m²
Technical Details
- 3,100 m² parking area
- 45-day programme
Materials & Specifications
- Sika repair chemicals and epoxy filler for crack repair
- Sika floor sealer primer coat
- Anti-slip coating and two coats of Sika epoxy floor paint
- Sika Fenomastic paint to parking-area walls
Engineering Approach
Works phased across the parking area to maintain partial access for the facility during the 45-day programme, with the repair-then-coat sequence following the specified Sika system build-up.
Quality & Inspection
Crack repairs were checked before the coating build-up proceeded, with the primer, anti-slip layer and the two Sika epoxy topcoats each checked against the specified system before the next was applied. Traffic marking and kerbstone repainting were checked against the approved layout, and the site was handed over after cleaning with waste disposed of to Abu Dhabi Municipality (ADM) regulations. See Quality & HSE for the full framework.
Results & Outcome
3,100 m² of parking structure rehabilitated and recoated within the 45-day programme, substrate repairs completed to the specified Sika system, epoxy floor coating applied, and reflective traffic markings reinstated at handover.