Al Maqam Palace, Sandwich Panel Roof Works
2,000 m² of insulated sandwich panel roofing together with its supporting structural steel at Al Maqam Palace, Abu Dhabi, combining supply, transportation, additional steel supports and installation into a single weather-tight roofing package across multiple locations on site.
Project Facts
Private estate. Client details withheld for confidentialityDelivered Across Multiple Disciplines
The Al Maqam Palace roofing package brought together structural steel and cladding scopes under one programme.
Sandwich Panel Roofing
2,000 m² of insulated sandwich panel roofing supplied and installed.
Structural Steel Support
Additional structural steel supports fabricated and fixed beneath the new roofing system.
Logistics
Transportation and delivery of panels to site, coordinated with the installation sequence.
Installation
Site installation and fixing of the steel and panel roofing system across three locations.
Delivery & Installation
Panels were transported and delivered to site, additional steel supports installed, and the new roofing fixed section by section.





Completed Roofing Works
Completed sandwich panel installation across three locations on the Al Maqam Palace site.



Project Detail
Scope of Work
- Supply & install 2,000 m² of insulated sandwich-panel roofing
- Additional structural steel supports
Technical Details
- 2,000 m² roofing area across three locations on site
Engineering Approach
Roof structure and panel layout were coordinated with the existing structural steel, so falls, fixings and insulation continuity stayed correct across the full roof area.
Quality & Inspection
Panel laps, fixings and flashings were checked across all three roof locations before handover, with falls and insulation continuity verified against the coordinated steel layout so the roof was confirmed weather-tight at handover. See Quality & HSE for the full framework.
Results & Outcome
2,000 m² of insulated sandwich-panel roofing supplied and installed over new structural steel supports, with panel laps, fixings and flashings completed and the roof handed over weather-tight.